Lot access by BRMC Education Building closed

wireready_01-13-2021-22-12-04_00007_brmclogo1

The lot entrance at the intersection of Bucher and Burnett drives at the rear of Baxter Regional Medical Center is closed due to construction. The lot entrance will be closed for six months, and vehicle access will be restricted.

BRMC officials say construction has begun on a project near the back loading dock by the cafeteria. This project will include the construction of a temporary loading dock for delivery and storage while updates are made to the current loading dock.

Parking near this lot entrance will also be affected, so those who typically use this lot will need to park in a different location.

Employees must use alternate approved designated parking. Pedestrian traffic will still be allowed during construction, and the cafeteria entrance will remain open.

WebReadyTM Powered by WireReady® NSI